Ignition, PLC Alex Marcy Ignition, PLC Alex Marcy

How to Program Lead/Lag Pumping in Ignition

Corso Systems describes how to approach lead/lag/standby pumping schemes from a control perspective and how to quickly integrate them into Ignition for operator control. Lead/lag/standby schemes are standard in pumping applications, especially in water/wastewater. They allow a system to operate at low capacity, ramp up to meet increased demand, and spread the operational load across multiple pumps to reduce maintenance costs.

Read More

Pet Food Scheduling, OEE, and Maintenance Management System

A leading manufacturer of high-quality, single-source recipe pet food with facilities across North America required a production scheduling management and OEE tracking system for a greenfield Facility. Ignition by Inductive Automation along with the OEE and Scheduling module from Sepasoft was chosen for the SCADA and MES platform, and the required functionality was developed by Corso Systems and tested with various OEM manufacturers on the various production and packaging lines at the facility.

Read More

Boss Mode: Ignition 100-Millisecond Tag History

Corso Systems shows how to capture date from a machine which creates immense pressure in a very small amount of time. The data wasn't being captured using Ignition's standard scan classes. We applied some thought and elbow grease to the problem and came up with an elegant way to capture and store the data.

Read More